SOP 1.1

Post-Brew Checklist

๐Ÿ“‹Category: Brewing Operations
โœ“Active
๐Ÿ“…Last Updated: February 10, 2026

๐ŸŽฏ Purpose & Scope

Ensure that all required tasks are completed after brewing, including proper documentation, equipment shutdown, sanitation, and transfer readiness. This SOP helps secure beer quality, equipment longevity, and a smooth transition into fermentation.

๐Ÿงฐ Materials & Equipment

๐Ÿ”ง Procedure

Record Gravity


CIP Preparation



Hose & Equipment Cleanup



Shutdown Process



Fermentor Prep



Fermentation Temperature


Brewhouse Closure



Tools



๐Ÿง  Notes & Tips


๐Ÿ“Œ

Best Practice: Ensure temperature settings and SG records match brew sheet values.

๐Ÿ”’

Safety: All hoses must be off the floor to prevent contamination.

โš ๏ธ

Warning: Tools left unclean can compromise the next batch.


๐ŸŽฏ Tujuan & Ruang Lingkup

Memastikan semua langkah penting setelah brewing dilaksanakan dengan benar, termasuk dokumentasi, shutdown alat, sanitasi, dan persiapan fermentasi. SOP ini menjaga kualitas bir dan memperpanjang umur alat produksi.

๐Ÿงฐ Bahan & Alat

๐Ÿ”ง Prosedur

Catat Gravity


Persiapan CIP



Bersihkan Selang & Alat



Proses Shutdown



Persiapan Fermentor



Suhu Fermentasi


Penutupan Brewhouse



Alat



๐Ÿง  Notes & Tips


๐Ÿ“Œ

Praktik Terbaik: Pastikan setelan suhu dan catatan SG sesuai dengan lembar brew.

๐Ÿ”’

Keamanan: Semua selang harus tergantung, tidak boleh menyentuh lantai.

โš ๏ธ

Peringatan: Alat yang tidak dibersihkan dapat mengkontaminasi batch berikutnya.